| PROJECT: |
|---|
| M/S. KEC INTERNATIONAL LTD, MUMBAI. |
| DEP: 2850 LPM @ 88 MWC – 2 Nos (Non FM Approved) |
| EP: 2850 LPM @ 88 MWC – 3 Nos (Non FM Approved) |
| JP: 10.8 @ 88 MWC – 2 Nos (Non FM Approved) |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Protection System |
| SPRINKLER SYSTEM: PROJECT: |
|---|
| M/S. KEC INTERNATIONAL, (M/S. HSK LOLOGISTICS LTD, SINGAPORE). |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Protection System. SoW: Fire Water Pump House, Yard Hydrant (Int. & Ext.), Sprinkler System for entire plant Total Length of Network: 55 KM |
| FIRE PROTECTION SYSTEM: PROJECT: |
|---|
| M/S. CHEYYAR SEZ DEVELOPERS PVT LTD, THINDIVANAM (CSD 3 & TD1) |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Protection System. SoW: Fire Water Pump House, Yard Hydrant (Int. & Ext.), Sprinkler System Total Length of Network: 25 KM |
| FIRE PROTECTION SYSTEM: PROJECT: |
|---|
| M/S. CHEYYAR SEZ DEVELOPERS PVT LTD, THINDIVANAM (CSD 3 & TD1) |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Protection System. SoW: Fire Water Pump House, Yard Hydrant (Int. & Ext.), Sprinkler System Total Length of Network: 25 KM |
| PUMP ROOM:
PROJECT: |
|---|
| M/S. SHELL INDIA MARKETS (P) LTD, BANGALORE, KA. |
| DP: 1500 GPM @ 95 MWC – 2 Nos (FM Approved) |
| EP: 1500 GPM @ 95 MWC – 2 Nos(FM Approved) |
| EP: 1000 GPM @ 95 MWC – 2 Nos (FM Approved) |
| JP: 75 GPM @ 95 MWC – 2 Nos (FM Approved) |
| (All Vertical Turbine Pumps) |
| SCOPE OF WORK: |
| Augmentation, Re-erection, Testing & Commissioning Of Fire Water Pump House |
| PUMP ROOM:
PROJECT: |
|---|
| M/S. SHELL INDIA MARKETS (P) LTD, BANGALORE, KA. |
| DP: 1500 GPM @ 95 MWC – 2 Nos (FM Approved) |
| EP: 1500 GPM @ 95 MWC – 2 Nos(FM Approved) |
| EP: 1000 GPM @ 95 MWC – 2 Nos (FM Approved) |
| JP: 75 GPM @ 95 MWC – 2 Nos (FM Approved) |
| (All Vertical Turbine Pumps) |
| SCOPE OF WORK: |
| Augmentation, Re-erection, Testing & Commissioning Of Fire Water Pump House |
| YARD HYDRANT SYSTEM:
PROJECT: |
|---|
| M/S. SHELL INDIA MARKETS (P) LTD, BANGALORE, KA. |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Hydrant System. MOC: Aboveground & Underground - Ductile Iron Double Flanged Pipes Total Length of Network: 4.7 KM |
| PUMP ROOM:
PROJECT: |
|---|
| M/S. AMWAY INDIA ENTERPRISES (P) LTD, MADURAI, TN. |
| DEP: 2000 GPM@ 88 MWC (FM Approved) |
| EP: 2000 GPM @ 88 MWC (FM Approved) |
| JP: 10.8 @ 88 MWC (Non FM Approved) |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Protection System |
| PUMP ROOM:
PROJECT: |
|---|
| M/S. GRIFFITH FOODS (P) LTD, BANGALORE, KA. |
| DP: 3000 GPM @ 88 MWC (FM Approved) |
| EP: 3000 GPM @ 88 MWC (Non FM Approved) |
| JP: 50 GPM @120 MWC
(Non FM Approved)
All Vertical Turbine Pumps |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Protection System |
| PUMP ROOM:
PROJECT: |
|---|
| M/S. BALRAMPUR CHINNI MILLS PVT LTD, MIZAPUR, UP. |
| DP: 410 Cu.Mtr/Hr @ 88 MWC – 2 Nos (Non FM Approved) |
| EP: 410 Cu.Mtr/Hr @ 88 MWC – 4 Nos (Non FM Approved) |
| JP: 82 Cu.Mtr/Hr @ 88 MWC – 2 Nos (Non FM Approved) |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Protection System. |
| YARD HYDRANT SYSTEM:
PROJECT: |
|---|
| M/S. CHEMPLAST SANMAR PVT LTD, KARAIKKAL, TN. |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Hydrant System.
MOC: Underground - Ductile Iron Tighten Joints Pipes Aboveground - MS ERW Total Length of Network: 4.1 KM |
| YARD HYDRANT SYSTEM:
PROJECT: |
|---|
| M/S. AMWAY INDIA ENTERPRISES (P) LTD, MADURAI, TN. |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Hydrant System.
MOC: Aboveground & Underground – MS ERW with Wrapping & Coating Total Length of Network : 6.2 KM |
| YARD HYDRANT SYSTEM:
PROJECT: |
|---|
| M/S. UNITED SPIRITS PVT. LTD., GULBARGA, KA. |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Hydrant System.
MOC: Aboveground - GI ERW & Underground – GI ERW with Wrapping & Coating Total Length of Network : 3.2 KM |
| FIRE WATER STORAGE TANK:
PROJECT: |
|---|
| M/S. PEPSICO, MAMANDUR, TN. |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Water Storage Tank.
MOC: MS Sheet Storage Capacity: 2 x 300 KL |
| FIRE WATER STORAGE TANK:
PROJECT: |
|---|
| M/S. PONPURE CHEMICALS PVT LTD, MALUR, KA. |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Water Storage Tank.
MOC: Zincalume Tank Storage Capacity: 1 x 150 KL |
| FIRE WATER STORAGE TANK:
PROJECT: |
|---|
| M/S. UNITED SPIRITS LTD, PONDICHERRY. |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Fire Water Storage Tank.
MOC: MS Tank Storage Capacity: 2 x 410 KL |
| SPRINKLER SYSTEM:
PROJECT: |
|---|
| M/S. APTAR PHARMA, HYDERABAD. |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Sprinkler System.
Area Protected: Raw Material Storage, Production Area, Finished Goods Storage etc. Standard: FM Approved. |
| SPRINKLER SYSTEM:
PROJECT: |
|---|
| M/S. YOKOHAMA TYRES LTD, DAHEJ. |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Sprinkler System.
Area Protected: Raw Material Storage, Production Area, Finished Goods Storage etc. Standard: FM Approved. |
| SPRINKLER SYSTEM:
PROJECT: |
|---|
| M/S. PONPURE CHEMICALS PVT LTD., MALUR, KA. |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Sprinkler System.
Area Protected: Production Area, Chemical Storage etc. Standard: NBC Standard. |
| SPRINKLER SYSTEM:
PROJECT: |
|---|
| M/S. ABBOTT HEALTHCARE INDIA PVT LTD., BADDI, HP |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of Sprinkler System.
Area Protected: Raw Material Storage, Production Area, Finished Goods Storage etc. Standard: FM Approved. |
| SPRINKLER SYSTEM:
PROJECT: |
|---|
| M/S. BRAKES INDIA PVT LTD., SHOLINGHUR, TN |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Commissioning Of MVWS Spray System for HSD Storage Tank.
Area Protected: HSD Storage Tank. Standard: NBC Standard. |
| HVAC SYSTEM:
PROJECT: |
|---|
| M/S. ISRO, SHRIHARIKOTTA, AP |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Comm. of HVAC System for MOTR. |
| HVAC SYSTEM:
PROJECT: |
|---|
| M/S. COLDMAN STORAGE PLANT |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Comm. of HVAC System for entire warehouse.. |
| HVAC SYSTEM:
PROJECT: |
|---|
| M/S. RAMACHANDRA MEDICAL COLLEGE AUDITORIUM |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Comm. of HVAC System for entire Auditorium and sports complex. |
| HVAC SYSTEM:
PROJECT: |
|---|
| M/S. TAMILNADU VETNARY COLLEGE AUDITORIUM |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Comm. of HVAC System for entire Auditorium. |
| HVAC SYSTEM:
PROJECT: |
|---|
| M/S. INDUTCH COMPOSITES TECHNOLOGY PVT LTD |
| SCOPE OF WORK: |
| Design, Engineering, Supply, Erection, Testing & Comm. of HVAC System for entire Factory.
Capacity: 2000 TR (Chiller & VRF). |